


An 87 ac. commerical site in Savannah needed our assistance in site prep and erosion control. Final phase included finish grading for site water runoff while protecting area wetlands.
Source point runnoff basins were built to prevent flood area silt from reaching local waterways. The complete site was then hydroseeded. Doright continues to do site maintainence and monitoring on this site. Several miles of type A and type C silt fencing was installed per engineered plans.
No comments:
Post a Comment